1. Access levels

a. Management

i Employer Management

To determine employers, a tree must be considered without subordinate constraints so that management can add them as a tree to the employer, some of which are as follows to complete.

1. Ministries

a. Ministry of Roads and City Planning
b. Ministry of Health
c. Ministry of Education
2. Municipalities

a. Municipality of district

(1) b. Municipality of district
(2) c. Municipality of district
(3) d. Municipality of district
(4) e. Municipality of district
(6) f. Municipality of district
(7) g. Municipality of district
(8) h. Municipality of district
(9) i. Municipality of district
(12) j Municipality of district
(14) 3. Organizations

a. Tehran Technical & Engineering Consultant
b. Tehran Engineering and Civil Engineering Organization
c. Organization of Investment and Public Participation of Tehran
d Construction Organization of Tehran Municipality
e. Tehran Beauty Organization
f Mohammad Sazeh Company
g. Tehran Metropolitan Railway Company (Metro)
h Abbas Abad Renovation Company i. Tehran and Suburbs Bus Company
4. City municipality

a. Tehran municipality
b. Municipality of karaj c. Qom municipality
d Municipality of kermanshah e. Sanandaj municipality
f Urmia Municipality
g. Municipality of kerman
h Municipality of Zahedan i. Municipality of Birjand
j Qasr-e-Shirin Municipality
k Municipality of Ilam
l Buchanan Municipality
m Municipality of Tonekabon
5. Foundation of the Islamic Revolutionary Deputies

a. Parsian Tourism and Recreation Center
b. Isfahan Kosar International Hotel Co.
c. Kosar Parsian International Hotel Co.
d Wave Tour Company
6. Other areas
a. Iran Atomic Energy Organization
b. Karaj metro station and suburbs
c. New Town of Hashtgerd
d International Exhibition Company of the Islamic Republic of Iran
e. Tehran Warehouse Chain Stores
f Azam Company
g. Other private sector employers

6. Other areas

a. Iran Atomic Energy Organization
b. Karaj metro station and suburbs
c. New Town of Hashtgerd
d International Exhibition Company of the Islamic Republic of Iran
e. Tehran Warehouse Chain Stores
f Azam Company
g. Other private sector employers

Project information trees

The information trees of the projects and their documentation, which are to be uploaded by the operator, can be added and edited in a non-existent manner:

Form information projects

All items that are added to the project information tree have an information form. This form can contain the title of items and the content model. The first model is the selected model (combo box), which can be used to add information items to comboboxes Added options. The second model is the free model (text box) used to write non-selective content.

The information trees of the employers can be added and edited as follows:

iii Manage entities

Here, as in the previous section, a tree with a 10-branch limit is considered, the directory of information ready for upload by the operator is considered, which is presented below some of them to be completed later.

1. Seville

a. Getting the base map

i Community design
ii. Spread plot
iii Lee
iv Facilities Maps

1. Water
2. Electricity
3. Gas
4. Telecommunications
5. Oil
6. Optical fiber
7. Other
v. Topographic maps

vi Geological maps

vii Meteorological maps

b. First phase
c. second phase
2. Structures

a. First phase
b. second phase
3. Railway

a. Seismic improvement
b. Seismic improvement and axial load increase
i Parts

1. Lists of bridges

a. maps
i Bridge maps before upgrading
ii. Retrofitting maps
iii Build maps
b. Computational documents
c. Secondary Services Reports
d Pilot Technical Information
e. Photos and videos
c. Increased axial load
d Restoration and restoration
4. Transport and traffic

a. Vehicle volume survey
b. Crash statistics
c. Analysis of the statistics and information mentioned
d Simulation information, traffic (modeling of the metropolis of Tehran and cities
e. Full reports of the services mentioned in paragraphs 1 to 4
f Vehicle volume survey
g. The most reasonable or best non-level intersection
h The most reasonable or best non-level intersection

Edit the information form

The information form of each of the project information branches is opened by clicking on it and can be edited by the administrator.

contractors

All contractor specifications and their information in each project contract can be defined and edited.

iv Manage users

1. Add and delete users
2. Access levels

a. the manager

The administrator’s access level has the ability to remove and add all the content trees, selections (combo boxes), and so on.

b. Operator

The operator’s access level only manages the ability to enter information of employers, projects, etc. based on specified items.

c. The user

The user level can only view and use the content sent by the manager and the operator in each project.

2. Advanced Search

a. Determine Employer Identifying Employed Persons
b. What project is the project to determine?
c. Determining the details of the projects can also be verified.

This website translated by google translate

    Comments

    Your email address will not be published. Required fields are marked *

کافه پلی بازی آنلاین تحلیل بازی پلی استیشن نقد فیلم و سریال تحلیل بازی کامپیوتری